top of page


Plastering and troweling

水電泥作.基礎施工

全室牆面. 底漆噴塗

最大坪效. 住商規劃

水電泥作.基礎施工
1/5
Service Description
1. The construction schedule needs to be arranged. The master cannot be available at any time.
2. Construction time is mainly on Saturdays, Sundays and winter and summer vacations.
3. Evening work assignments will increase the allowance for the workers
4. Air conditioning and gas are special industries. We do not handle them.
5. On-site inspection is required. Additional travel expenses will be charged
6. To ensure construction quality, all consumables are purchased by Youpu
bottom of page
